Pampa
New floors, a fresh coat of paint, a bathroom torn down to the studs. Whatever the job is on your house in Pampa, it starts the same way. Somebody has to get everything out of the way first.
You can shove it all into one back bedroom and work around it for a month. Or you can haul it across town, let the work happen in a room with nothing in it, and bring it home when the last coat is dry. Here is how to do the second one without making a mess of it.
Clear the room before the work starts
Have the room bare the day before anyone shows up to work. Not half bare. Bare.
Flooring can't go down under a china hutch. A painter can't roll a wall behind a bookcase. And sanding, tile cutting and sheetrock all throw off a fine dust that settles on every flat surface in the house, plus a few that aren't flat. The less sitting in the room, the less you clean or replace afterward.
It also keeps the job moving. Nobody stops at nine in the morning to figure out where the sectional goes.
What leaves and what stays
Not everything has to make the trip. A good rule: if it's in the way and you won't need it before the job wraps up, it goes.
Take to the unit:
Couches, recliners, beds and dressers from the rooms being worked on
Rugs, rolled and tied
Bookcases and what's on them, boxed
Wall art and mirrors, so they're not leaning against a wall that's about to get painted
Extra chairs, side tables, the stuff that piles up in a spare room
Keep at the house:
What you use every day: the coffee pot, work clothes, school things, medicine
Paperwork you'll need while the job is going, like the bid, receipts and warranties
Anything that needs a steady temperature (more on that below)
Set up one room you aren't touching as home base, and live out of it until the work is done.
Wrap it before it rides
A few ...
—
November 17th, 2026